Pressure as recorded at the wellhead when the valves p re closed and the well is shut in. To allow the pressure to buildup to its peak, the well is shut in for 24 hours or even longer. This permits the gas to move out of the formation toward the borehole and build its head of pressure. See reservoir pressure.