To put a completed pipeline in the ditch. This is done with side-boom tractors that lift the pipe in slings and carefully lower it into the ditch. The slings are made of layers of heavy canvas or rubber-impregnated fabric so as not to scuff or break the anticorrosion pipe coating which is applied to all buried pipelines.